Training Plan: Difference between revisions

From HuNu Wiki
Jump to navigation Jump to search
mNo edit summary
mNo edit summary
 
(5 intermediate revisions by the same user not shown)
Line 12: Line 12:
|-
|-
|Bottle Sterilising Proceedure
|Bottle Sterilising Proceedure
|TBC
|See: [[Bottle sterilising procedure|Bottle Sterilising Procedure]]
|-
|Bottle Filling Procedure
|See: [[Bottling procedure|Bottle Filling Procedure]]
|}
|}


Line 25: Line 28:
|This process must only be carried out when:
|This process must only be carried out when:
'''Production''' is paused.
'''Production''' is paused.
|Valve Maintenance Training Document
|Valve Maintenance Training Document <span style="color:red">(To be done)</span>
|-
|-
|Cores
|Cores
|This process must only be carried out when:
|This process must only be carried out when:
The '''core''' to be serviced is paused.
The '''core''' to be serviced is paused.
|Core Maintenance Training Document
|Core Maintenance Training Document <span style="color:red">(To be done)</span>
|}
|}



Latest revision as of 05:31, 23 January 2024

Training Activities

Training area Training documents to download
All Personal Hygiene activities See: Personal Hygene Training Plan
Effective Hand Washing Technique See: Effective Hand Washing
Bottle Sterilising Proceedure See: Bottle Sterilising Procedure
Bottle Filling Procedure See: Bottle Filling Procedure

Production Specific Training

Items to be maintained Notes Downloads
Matrix Valves This process must only be carried out when:

Production is paused.

Valve Maintenance Training Document (To be done)
Cores This process must only be carried out when:

The core to be serviced is paused.

Core Maintenance Training Document (To be done)

Return Links:

Home ¦ GMP ¦ Training