Training Plan: Difference between revisions

From HuNu Wiki
Jump to navigation Jump to search
(Created page with "== Training Activities == {| class="wikitable sortable" |+ !Items, areas to be cleaned !Frequency of Cleaning !Method of Cleaning !Chemical, Dilution and Contact Time |- |Production Area Floor |Weekly or as required |Mop & Bucket |Water and generic floor detergent |- |Cube Floor |Weekly or as required |By hand with cloth |Anti-bacterial spray |- |Toilet and handwashing area |Daily or as required |Toilet brush & cloth |Anti-bacterial spray, toilet bleach |- |Production C...")
 
mNo edit summary
 
(18 intermediate revisions by the same user not shown)
Line 2: Line 2:
{| class="wikitable sortable"
{| class="wikitable sortable"
|+
|+
!Items, areas to be cleaned
!Training area
!Frequency of Cleaning
!Training documents to download
!Method of Cleaning
!Chemical, Dilution and Contact Time
|-
|-
|Production Area Floor
|All Personal Hygiene activities
|Weekly or as required
|See: [[Hygiene Plan|Personal Hygene Training Plan]]
|Mop & Bucket
|Water and generic floor detergent
|-
|-
|Cube Floor
|Effective Hand Washing Technique
|Weekly or as required
|See: [https://hunuhq.com/docs/GMP_Docs/House_Rules_PDFs/Effective%20Hand%20Washing.pdf Effective Hand Washing]
|By hand with cloth
|Anti-bacterial spray
|-
|-
|Toilet and handwashing area
|Bottle Sterilising Proceedure
|Daily or as required
|See: [[Bottle sterilising procedure|Bottle Sterilising Procedure]]
|Toilet brush & cloth
|Anti-bacterial spray, toilet bleach
|-
|-
|Production Cores
|Bottle Filling Procedure
|As required
|See: [[Bottling procedure|Bottle Filling Procedure]]
|Empty and wash with cold water
|N/A
|-
|Production sink (Large)
|Daily or as required
|Cloth
|Anti-bacterial spray, bleach spray
|-
|Production sink (Small)
|Weekly or as required
|Cloth
|Anti-bacterial spray, bleach spray
|-
|Exterior of Cube
|Monthly
|Cloth
|Anti-bacterial spray
|}
|}


== Production Specific Maintenance ==
== Production Specific Training ==
{| class="wikitable"
{| class="wikitable"
|+
|+
!Items to be maintained
!Items to be maintained
!Method of maintenance
!Notes
!Downloads
|-
|-
|Matrix Valves
|Matrix Valves
|This process must only be carried out when production is paused.
|This process must only be carried out when:
 
'''Production''' is paused.
 
|Valve Maintenance Training Document <span style="color:red">(To be done)</span>
|-
|Cores
|This process must only be carried out when:
The '''core''' to be serviced is paused.
|Core Maintenance Training Document <span style="color:red">(To be done)</span>
|}
|}



Latest revision as of 05:31, 23 January 2024

Training Activities

Training area Training documents to download
All Personal Hygiene activities See: Personal Hygene Training Plan
Effective Hand Washing Technique See: Effective Hand Washing
Bottle Sterilising Proceedure See: Bottle Sterilising Procedure
Bottle Filling Procedure See: Bottle Filling Procedure

Production Specific Training

Items to be maintained Notes Downloads
Matrix Valves This process must only be carried out when:

Production is paused.

Valve Maintenance Training Document (To be done)
Cores This process must only be carried out when:

The core to be serviced is paused.

Core Maintenance Training Document (To be done)

Return Links:

Home ¦ GMP ¦ Training