Maintenance Plan

From HuNu Wiki
Revision as of 06:46, 19 January 2024 by Des (talk | contribs)
Jump to navigation Jump to search

Building Maintenance Tasks

Maintenance Item Frequency of Maintenance Method of Maintenance Special equpimment required
Clean paving around building Every 2 months
  • Clear paths with broom
  • Use pressure washer with patio head
  • Rinse down with pressure nozzle
  • Preassure washer
  • Patio head
  • Power nozzle

Production Specific Maintenance

Items to be maintained Method of maintenance Related Training Information
Matrix Valves This process must only be carried out when production is paused. Matrix Valve Training

Return Links:

Home ¦ GMP ¦ Cleaning