Maintenance Plan: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
| Line 10: | Line 10: | ||
|Every 2 months | |Every 2 months | ||
| | | | ||
# Clear paths with broom | |||
# Use pressure washer with patio head | |||
# Rinse down with pressure nozzle | |||
| | | | ||
* Preassure washer | * Preassure washer | ||
Latest revision as of 05:08, 23 January 2024
Building Maintenance Tasks
| Maintenance Item | Frequency of Maintenance | Method of Maintenance | Special equpimment required |
|---|---|---|---|
| Clean paving around building | Every 2 months |
|
|
Production Specific Maintenance
| Items to be maintained | Method of maintenance | Related Training Information |
|---|---|---|
| Matrix Valves | This process must only be carried out when production is paused. | Matrix Valve Training |
Return Links:
Home ¦ GMP ¦ Maintenance