Training Plan
Training Activities
| Training area | Details of training | Downloads |
|---|---|---|
| Matrix Valve | ||
| Cube Floor | Weekly or as required | |
| Toilet and handwashing area | Daily or as required | |
| Production Cores | As required | |
| Production sink (Large) | Daily or as required | |
| Production sink (Small) | Weekly or as required | |
| Exterior of Cube | Monthly |
Production Specific Maintenance
| Items to be maintained | Method of maintenance |
|---|---|
| Matrix Valves | This process must only be carried out when production is paused.
|