Training Plan

From HuNu Wiki
Revision as of 05:11, 18 January 2024 by Des (talk | contribs)
Jump to navigation Jump to search

Training Activities

Training area Details of training Downloads
Matrix Valve
Cube Floor Weekly or as required
Toilet and handwashing area Daily or as required
Production Cores As required
Production sink (Large) Daily or as required
Production sink (Small) Weekly or as required
Exterior of Cube Monthly

Production Specific Maintenance

Items to be maintained Method of maintenance
Matrix Valves This process must only be carried out when production is paused.



Return Links:

Home ¦ GMP ¦ Training