Training Plan
Training Activities
Training area | Details of training | Downloads |
---|---|---|
Matrix Valve | ||
Cube Floor | Weekly or as required | |
Toilet and handwashing area | Daily or as required | |
Production Cores | As required | |
Production sink (Large) | Daily or as required | |
Production sink (Small) | Weekly or as required | |
Exterior of Cube | Monthly |
Production Specific Maintenance
Items to be maintained | Method of maintenance |
---|---|
Matrix Valves | This process must only be carried out when production is paused.
|