Pest Control Plan: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
Line 17: | Line 17: | ||
|Check & Empty Fly Killer | |Check & Empty Fly Killer | ||
| | | | ||
# Turn off Fly Killer at mains socket | |||
# Put on single use gloves | |||
# Collect waste bag | |||
# Remove front grill from Fly Killer | |||
# Remove & empty tray from bottom of Fly Killer into waste bag | |||
# Use cloth and [https://hunuhq.com/docs/GMP_Docs/Data%20Sheets/isopropanol.pdf isopropyl alcohol] to clean wires and internal parts | |||
#Close Fly Killer | |||
#Use dustpan & brush to collect any insects from the floor | |||
#Turn on Fly Killer | |||
#Log activity online | |||
|Weekly or as required | |Weekly or as required | ||
|- | |- |
Revision as of 05:10, 23 January 2024
Pest Control Activities
Activity | Details of activity | Frequency |
---|---|---|
Pest Proofing of the premises | Weekly walk round of premises and check visually : -
|
Weekly |
Check & Empty Fly Killer |
|
Weekly or as required |
Visual check for insects in production space | As part of normal activity, keep an active look out for any sign of pests / insects. | Daily / Constantly |
Visual check for insects in Cube | During any entry to the Cube, keep an active look out for any sign of pests / insects. | Daily / at every entry |
Good Housekeeping |
|
On going |
Monitoring / checking and any other appropriate records |
Return Links:
Home ¦ GMP ¦ Pest Control