Training Plan: Difference between revisions

From HuNu Wiki
Jump to navigation Jump to search
(Created page with "== Training Activities == {| class="wikitable sortable" |+ !Items, areas to be cleaned !Frequency of Cleaning !Method of Cleaning !Chemical, Dilution and Contact Time |- |Production Area Floor |Weekly or as required |Mop & Bucket |Water and generic floor detergent |- |Cube Floor |Weekly or as required |By hand with cloth |Anti-bacterial spray |- |Toilet and handwashing area |Daily or as required |Toilet brush & cloth |Anti-bacterial spray, toilet bleach |- |Production C...")
 
mNo edit summary
Line 2: Line 2:
{| class="wikitable sortable"
{| class="wikitable sortable"
|+
|+
!Items, areas to be cleaned
!Training area
!Frequency of Cleaning
!Details of training
!Method of Cleaning
!Downloads
!Chemical, Dilution and Contact Time
|-
|-
|Production Area Floor
|Matrix Valve
|Weekly or as required
|
|Mop & Bucket
|
|Water and generic floor detergent
|-
|-
|Cube Floor
|Cube Floor
|Weekly or as required
|Weekly or as required
|By hand with cloth
|
|Anti-bacterial spray
|-
|-
|Toilet and handwashing area
|Toilet and handwashing area
|Daily or as required
|Daily or as required
|Toilet brush & cloth
|
|Anti-bacterial spray, toilet bleach
|-
|-
|Production Cores
|Production Cores
|As required
|As required
|Empty and wash with cold water
|
|N/A
|-
|-
|Production sink (Large)
|Production sink (Large)
|Daily or as required
|Daily or as required
|Cloth
|
|Anti-bacterial spray, bleach spray
|-
|-
|Production sink (Small)
|Production sink (Small)
|Weekly or as required
|Weekly or as required
|Cloth
|
|Anti-bacterial spray, bleach spray
|-
|-
|Exterior of Cube
|Exterior of Cube
|Monthly
|Monthly
|Cloth
|
|Anti-bacterial spray
|}
|}



Revision as of 05:11, 18 January 2024

Training Activities

Training area Details of training Downloads
Matrix Valve
Cube Floor Weekly or as required
Toilet and handwashing area Daily or as required
Production Cores As required
Production sink (Large) Daily or as required
Production sink (Small) Weekly or as required
Exterior of Cube Monthly

Production Specific Maintenance

Items to be maintained Method of maintenance
Matrix Valves This process must only be carried out when production is paused.



Return Links:

Home ¦ GMP ¦ Training