Maintenance Plan: Difference between revisions

From HuNu Wiki
Jump to navigation Jump to search
mNo edit summary
mNo edit summary
Line 33: Line 33:
----
----
==== Return Links: ====
==== Return Links: ====
[[Home]] ¦ [[GMP]] ¦ [[Cleaning]]
[[Home]] ¦ [[GMP]] ¦ [[Maintenance]]

Revision as of 06:48, 19 January 2024

Building Maintenance Tasks

Maintenance Item Frequency of Maintenance Method of Maintenance Special equpimment required
Clean paving around building Every 2 months
  • Clear paths with broom
  • Use pressure washer with patio head
  • Rinse down with pressure nozzle
  • Preassure washer
  • Patio head
  • Power nozzle

Production Specific Maintenance

Items to be maintained Method of maintenance Related Training Information
Matrix Valves This process must only be carried out when production is paused. Matrix Valve Training

Return Links:

Home ¦ GMP ¦ Maintenance