Maintenance Plan: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
Line 52: | Line 52: | ||
|Matrix Valves | |Matrix Valves | ||
|This process must only be carried out when production is paused. | |This process must only be carried out when production is paused. | ||
|[[Training Plan#Production Specific Training|Matrix Valve Training]] | |[[Training Plan#Production Specific Training|Matrix Valve Training]] | ||
|} | |} |
Revision as of 09:41, 18 January 2024
Building Maintenance Tasks
Items, areas to be cleaned | Frequency of Cleaning | Method of Cleaning | Chemical, Dilution and Contact Time |
---|---|---|---|
Production Area Floor | Weekly or as required | Mop & Bucket | Water and generic floor detergent |
Cube Floor | Weekly or as required | By hand with cloth | Anti-bacterial spray |
Toilet and handwashing area | Daily or as required | Toilet brush & cloth | Anti-bacterial spray, toilet bleach |
Production Cores | As required | Empty and wash with cold water | N/A |
Production sink (Large) | Daily or as required | Cloth | Anti-bacterial spray, bleach spray |
Production sink (Small) | Weekly or as required | Cloth | Anti-bacterial spray, bleach spray |
Exterior of Cube | Monthly | Cloth | Anti-bacterial spray |
Production Specific Maintenance
Items to be maintained | Method of maintenance | Related Training Information |
---|---|---|
Matrix Valves | This process must only be carried out when production is paused. | Matrix Valve Training |