Maintenance Plan: Difference between revisions

From HuNu Wiki
Jump to navigation Jump to search
mNo edit summary
mNo edit summary
Line 52: Line 52:
|Matrix Valves
|Matrix Valves
|This process must only be carried out when production is paused.
|This process must only be carried out when production is paused.
|[[Training Plan#Production Specific Training|Matrix Valve Training]]
|[[Training Plan#Production Specific Training|Matrix Valve Training]]
|}
|}

Revision as of 09:41, 18 January 2024

Building Maintenance Tasks

Items, areas to be cleaned Frequency of Cleaning Method of Cleaning Chemical, Dilution and Contact Time
Production Area Floor Weekly or as required Mop & Bucket Water and generic floor detergent
Cube Floor Weekly or as required By hand with cloth Anti-bacterial spray
Toilet and handwashing area Daily or as required Toilet brush & cloth Anti-bacterial spray, toilet bleach
Production Cores As required Empty and wash with cold water N/A
Production sink (Large) Daily or as required Cloth Anti-bacterial spray, bleach spray
Production sink (Small) Weekly or as required Cloth Anti-bacterial spray, bleach spray
Exterior of Cube Monthly Cloth Anti-bacterial spray

Production Specific Maintenance

Items to be maintained Method of maintenance Related Training Information
Matrix Valves This process must only be carried out when production is paused. Matrix Valve Training