Maintenance Plan: Difference between revisions

From HuNu Wiki
Jump to navigation Jump to search
mNo edit summary
mNo edit summary
 
(One intermediate revision by the same user not shown)
Line 10: Line 10:
|Every 2 months
|Every 2 months
|
|
* Clear paths with broom
# Clear paths with broom
* Use pressure washer with patio head
# Use pressure washer with patio head
* Rinse down with pressure nozzle
# Rinse down with pressure nozzle
|
|
* Preassure washer
* Preassure washer
Line 33: Line 33:
----
----
==== Return Links: ====
==== Return Links: ====
[[Home]] ¦ [[GMP]] ¦ [[Cleaning]]
[[Home]] ¦ [[GMP]] ¦ [[Maintenance]]

Latest revision as of 05:08, 23 January 2024

Building Maintenance Tasks

Maintenance Item Frequency of Maintenance Method of Maintenance Special equpimment required
Clean paving around building Every 2 months
  1. Clear paths with broom
  2. Use pressure washer with patio head
  3. Rinse down with pressure nozzle
  • Preassure washer
  • Patio head
  • Power nozzle

Production Specific Maintenance

Items to be maintained Method of maintenance Related Training Information
Matrix Valves This process must only be carried out when production is paused. Matrix Valve Training

Return Links:

Home ¦ GMP ¦ Maintenance