Maintenance Plan: Difference between revisions
Jump to navigation
Jump to search
(Created page with "== Routine Cleaning Tasks == {| class="wikitable sortable" |+ !Items, areas to be cleaned !Frequency of Cleaning !Method of Cleaning !Chemical, Dilution and Contact Time |- |Production Area Floor |Weekly or as required |Mop & Bucket |Water and generic floor detergent |- |Cube Floor |Weekly or as required |By hand with cloth |Anti-bacterial spray |- |Toilet and handwashing area |Daily or as required |Toilet brush & cloth |Anti-bacterial spray, toilet bleach |- |Productio...") |
mNo edit summary |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
== | == Building Maintenance Tasks == | ||
{| class="wikitable sortable" | {| class="wikitable sortable" | ||
|+ | |+ | ||
! | !Maintenance Item | ||
!Frequency of | !Frequency of Maintenance | ||
!Method of | !Method of Maintenance | ||
! | !Special equpimment required | ||
|- | |- | ||
| | |Clean paving around building | ||
| | |Every 2 months | ||
| | | | ||
# Clear paths with broom | |||
# Use pressure washer with patio head | |||
# Rinse down with pressure nozzle | |||
| | |||
* Preassure washer | |||
* Patio head | |||
* Power nozzle | |||
| | |||
|} | |} | ||
== Production Specific | == Production Specific Maintenance == | ||
{| class="wikitable" | {| class="wikitable" | ||
|+ | |+ | ||
!Items | !Items to be maintained | ||
!Method of | !Method of maintenance | ||
! | !Related Training Information | ||
|- | |- | ||
| | |Matrix Valves | ||
| | |This process must only be carried out when production is paused. | ||
|[[Training Plan#Production Specific Training|Matrix Valve Training]] | |||
| | |||
|} | |} | ||
---- | ---- | ||
==== Return Links: ==== | ==== Return Links: ==== | ||
[[Home]] ¦ [[GMP]] ¦ [[ | [[Home]] ¦ [[GMP]] ¦ [[Maintenance]] |
Latest revision as of 05:08, 23 January 2024
Building Maintenance Tasks
Maintenance Item | Frequency of Maintenance | Method of Maintenance | Special equpimment required |
---|---|---|---|
Clean paving around building | Every 2 months |
|
|
Production Specific Maintenance
Items to be maintained | Method of maintenance | Related Training Information |
---|---|---|
Matrix Valves | This process must only be carried out when production is paused. | Matrix Valve Training |
Return Links:
Home ¦ GMP ¦ Maintenance